通化沦笨娱乐有限公司

The current position:Home > Products > Laboratory electric furnace > GSX Series of energy-efficient high-temperature sintering electric furnace

Click to enlarge

GSX Series of energy-efficient high-temperature sintering electric furnace

RELATED ARTICLES
Introduction

 
 
               
 
Applicable to laboratory and industrial inorganic materials sintered in the furnace, especially for zirconia, alumina, industrial production, the use of new materials and new design, the energy saving effect creating a new energy-saving electric furnace milestone.
     , The furnace power consumption is 25-30%, greatly saves energy and reduces the cost of the ordinary electric furnace.
     Second, shorten the production cycle. The electric furnace to save 50% and shorten the production cycle of the cooling time
     , Furnace uniformity product appearance
     Fourth, lift smooth, easy loading and unloading products.
 
型  號 規 格
爐膛尺寸
長/寬/高mm
額定燒結溫度
功     率
kw
控制方式
GSX-1-13,16
300/300/300
1350,1650
12,15
32段程控
GSX-2-13,16
400/400/400
1350,1650
18,25
32段程控
GSX-3-13,16
600/600/600
1350,1650
30,40
32段程控
GSX-4-13,16
800/800/800
1350,1650
40, 60
32段程控
 可定制各類尺寸、溫度的非標電爐
 
 
 
 
     
Example:
 
  
      I should Zhuzhou requirements of a company (production of zirconia, alumina, industrial supplies), 400/350/600 electric furnace production in 2005, and for small batch firing achieve good energy saving effect and shorten the production cycle basis on the design and manufacture. Its energy-saving effect creating a new energy-saving electric furnace milestone.
     The lift furnace design effective volume 600/600/600mm, 1650 ℃, ordinary electric furnace of the same specifications produced by a company of Yixing:
     An ordinary electric furnace to complete sintering (40 hours) to about 1000 degrees power, the new furnace When sintering was complete (40 hours) of about 230 degrees of power, savings of 770 degrees. Significantly save energy and reduce costs.
     Second, shorten the production cycle. Ordinary electric furnace to complete cooling takes about 3-4 days, new electric furnace to complete the cooling time is about 1-2 days. Two days, saving time and shorten the production cycle
    Third, the furnace temperature uniformity and appearance of the product after sintering
    Fourth, lift smooth, easy loading and unloading products. 
 
 
 
 

 

 

 

 
 
 
 
 


 
 
點擊次數:897

 

Order

留言框

  • Theme:

  • Content:

  • Commpany:

  • Name:

  • Telephone:

  • Email:

  • Address:

  • Province:

  • Verification Code:

Contact

Email:130732189@qq.com
Address:Add:No.168 Xiaotang east road,German Industrial Park,Xiangtan City,Hunan,China
WeChat scan focuses on us:
Service Contact Code

Hotline

86+0731-58534888,86+13607322318

Sweep and pay attention to us.

手机足球直播app| 斗球体育直播app下载| cctv5直播足球| 看球直播app下载官网最新版| 足球直播软件app免费网站| u球体育app官方下载| 实况足球2024最新版本| 咪咕视频下载免费安装| 足球直播观看免费版| 178体育苹果下载| 看个球app官方免费下载| jrs低调看高清直播免费| cctv5直播在线观看足球直播| 178体育官网入口网站| 人人体育app官方下载| 免费看球神器| whoscored足球数据网| nba直播jrs在线观看免费| 足球看盘软件哪个好| 腾讯体育直播篮球| 斗球app官网入口| 人人体育app官方下载| jrs直播低调看直播奥运会| 01体育赛事免费直播| 看球直播app下载官网最新版| 蓝鲸体育app官方下载| 足球比赛直播| 88体育官网手机版入| 实况足球2024最新版本| 直播足球的平台app| 球宴app官方入口| 蓝鲸体育直播app官网下载| jrs低调看NBA高清直播官网| 可以看足球直播的app软件| 蓝鲸体育直播app官网下载| jrs直播低调看直播奥运会| 今晚足球比赛在哪可以看直播| 龙珠足球直播(无插件)直播体育| opta足球数据官网| 直播平台有哪些推荐| 足球看盘软件哪个好|